Which of these applies is a conversation, and it is a short one when it happens early.
Option 01
In full, on completion
The simplest arrangement: the work is done, you look at it, you pay. Common on shorter jobs where no materials have to be bought in ahead of time, and the one with the fewest moving parts.
Ask: when is payment due — on the day, or within a set number of days of the invoice?Option 02
Deposit, then the balance
Part up front and the rest at the end. The deposit normally covers materials ordered specifically for your job, or holds a date. It is usual on anything that has to be bought in, and it should be written down with the rest of the price.
Ask: what does the deposit cover, and what happens to it if the job is cancelled or postponed?Option 03
Staged payments
Payment released in steps tied to visible progress rather than to dates in a calendar. On a longer job it keeps both sides level — nobody is a long way ahead on money or a long way ahead on work.
Ask: what exactly has to be finished before each stage is payable, and who decides it is finished?Option 04
Card, transfer, cash or cheque
The method rather than the timing. Which of these a business takes varies, and a few add a handling charge on cards. Paying by a method that leaves a record is generally worth a small cost, because a record is what a warranty claim is built on.
Ask: which methods do you take, and is there a surcharge on any of them?
Whichever arrangement a job lands on, it belongs in writing with the rest of the price. The glossary covers the words that turn up on the paperwork.
The short version
Ask what the price covers
A figure that names what is included, what is not, and when it is due is worth more than a lower figure that names none of them.
Next step
Get the figure in writing
Tell us what the job needs in Redondo Beach and the price comes back written down.